亚洲人成网站在线播毛片房-亚洲欧美日韩综合俺去了-国产a级毛片-国产精品乱码一区二区

Location:Home?>?detail
Phase I Project of Chongqing Rail Transit Line 5
Source:CREC Date:2018年11月28日

The total length of the line is 39.75 kilometers, of which the underground line is about 31.18-kilometer-long, the elevated line is about 8.12-kilometer-long, the ground line and the open section are about 450-meter-long. It set 25 stations and the total investment of the project is about 20 billion yuan.

Phase I Project of Chongqing Metro Line 5

?

Print Close