亚洲人成网站在线播毛片房-亚洲欧美日韩综合俺去了-国产a级毛片-国产精品乱码一区二区

Location:Home?>?detail
Dayaoshan Tunnel
Source:International Business Division Date:2018年11月27日

With a total length of 14 kilometers, Dayaoshan Tunnel of Hengyang-Guangzhou Railway, started in 1981 and completed in 1989, at which time it was the longest electrified double-track railway tunnel in China. CREC independently built the entire tunnel and applied the New Austrian Tunneling Method for the first time to build long mountain railway tunnel and won the National Science and Technology Advancement Award.

Daoyaoshan Tunnel

?

Print Close